MERLIN UPGRADES POWER SUPPLY AT C&W

Cable & Wireless, has improved the reliance of the standby power system at its Dock Street offices in London with the support of integrated power support company, Merlin Power Management. An extension of a long-standing working relationship between the two companies that began in 2001, Merlin Power Management was awarded the contract for its innovative solutions and competitive pricing.

Undertaken to improve the resilience of the emergency mains supply and ensure sufficient reserve generator capacity in the event of equipment failure, Merlin Power engineered and project managed the contract from initial site survey through to installation, commissioning, testing and final handover.

“Merlin Power Management was awarded the contract on a competitive tender for its recognised expertise and for providing a fast and proficient service”, says John Coston, Principal Engineer for Cable & Wireless London Region. “Merlin came up with the best solution and carried out the work in an efficient and satisfactory manner”.

The following two tabs change content below.

admin

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam dignissim magna vitae dui posuere eu feugiat augue eleifend. Fusce sed tincidunt quam. Donec varius aliquam metus ut semper. Donec augue purus, feugiat interdum malesuada vel, aliquet quis massa. Nulla facilisi. Nam vel ante quam, et tincidunt dui. Maecenas venenatis libero eu nulla tincidunt et accumsan velit sodales. Nam congue mauris et felis porttitor blandit. Nam eget tempor massa. Nullam suscipit gravida eros, ac suscipit magna feugiat sit amet.

Latest posts by admin (see all)